Furniture Landed Cost Examples and Worksheet

Build an itemised furniture landed-cost worksheet with clear specification revisions, quotation scope and unresolved costs. Includes an editable illustrative BOQ.

Updated by the Source Foshan sourcing team in Foshan.

Furniture landed cost is the cost of the specified goods and the services required to reach an agreed destination and delivery level. Compare the same quantity, specification, currency, route and scope. Keep unresolved amounts marked awaiting quote.

Start with a filled specification example

The furniture quote and BOQ example contains three proposed living-room furniture lines, quantities, dimensions, materials and revision statuses. It is an educational example, not a customer order or supplier quotation. No prices or tax rates have been inserted.

Download the editable quotation and BOQ workbook (.xlsx)

Keep the scope behind every amount

Cost line Amount Confirm in writing
Goods Awaiting quote Item revision, quantity, unit price and currency
Sourcing / service fee Awaiting quote Basis, scope, payment milestones and any minimum fee
China collection and warehouse Awaiting quote Pickup by supplier, receipt checks and storage allowance
Inspection and packing Awaiting quote Inspection scope, sample charges, crates and export preparation
Ocean freight and surcharges Awaiting quote Mode, measured packed volume, route and quotation validity
Cargo insurance Awaiting quote Insured value, deductible, cover and exclusions
Customs broker and filings Awaiting quote Importer, broker, entry, bond and filing scope
Duty and other import charges Awaiting quote Item classification, origin, applicable measures and entry date
Destination handling / storage Awaiting quote Terminal or LCL release, free time and conditional charges
Final delivery Awaiting quote Named address, access, unloading and carry-in level
Assembly / packaging removal Awaiting quote Who performs each service and the written scope
Project contingency Awaiting quote Separate buyer allowance with a reason; not a supplier charge

Record the quotation reference, responsible party, date, validity and exclusions next to each amount. Record conditional costs such as extra storage or waiting time with their trigger. A contingency is a separate buyer allowance with a stated reason; it does not turn an unresolved charge into a confirmed price.

How the workbook handles missing prices

  • Goods line amount = quantity × unit price, only after both are supplied.
  • The goods subtotal stays blank until every listed goods price is supplied.
  • The complete cost-plan total stays blank until each listed goods and cost line has a numeric amount.
  • Enter zero only when a written quotation confirms no charge or not applicable. Leave unknowns blank.

A calculated total does not approve the goods or confirm a quote is still valid. Check the supporting quotations, scope and approvals before committing.

Compare the right order size

A room trial or a small order: confirm supplier minimum quantities and fixed sample, service, inspection, handling, freight and delivery charges before deciding. One piece may be technically available yet expensive to deliver by itself.

A whole-home order: compare the approved room schedule, packed measurements, consolidation plan and destination service. A staged delivery is a separate planning choice; it does not mean the buyer must commit to the full home to ask about one room.

What published client cases can tell you

The Seattle custom cabinetry case records the client’s reported total of USD 13,600 excluding separately purchased handles. It is not an invoice-level breakdown of goods, freight, duty and installation and should not be used as a current price for another order.

The Sydney case describes a planning allowance that changed from CNY 60,000 to CNY 65,000; those figures are not a verified final payment. The Milan case reports 6.8 m³ of packed goods, which illustrates consolidation scope rather than a freight rate. These cases are separate from the illustrative BOQ.

US import-cost checks

Give your broker the function, materials, construction, origin and supplier details for each item. Ask for a dated classification and applicable-charge review against the expected entry date. Start with CBP’s furniture import guidance and the current USITC tariff schedule. Do not apply one blended furniture tariff to the entire list.

Define the last mile

Record the exact address or terminal, quote currency, named delivery terms and responsible parties. Confirm separately whether the price includes unloading, carry-in, stairs, room placement, assembly and packaging removal. Keep import arrangements and any exceptions visible in the written quotation.

Continue with the US shipping checklist, consolidation guide and designer specification example.

Put the guide to work

Send your list. We will tell you honestly how it would run.

A floor plan, an FF&E schedule, a product link or a rough brief is enough. Our local team in Foshan replies within one business day with real options, prices and lead times — no commitment.

Start Your Project

WhatsApp +86 151 9256 9580 · [email protected] · WeChat 15192569580