Furniture & FF&E Sourcing for Interior Designers, Direct from Foshan
Quick answer: Designer-led sourcing works when the design schedule, revision log, finish approvals, shop drawings, samples and site interfaces stay connected. The designer owns design intent and approvals; suppliers own manufacturing details; the local coordinator tracks questions, evidence and handovers. Every change should name the decision owner and update the controlled document.
Your drawings, your finish schedule, your brand. Our factories, our inspectors, one delivery.
Furniture sourcing for interior designers, in five moves.
You stay in front of the client. We run everything between your spec and the site.
BriefFF&E schedule, drawings or a mood board. Reply within one business day.
Options sheetTwo or three matched suppliers per line with trade pricing, materials and lead times.
SamplesFinish cards and fabric swatches to your studio; first articles for custom pieces.
Production & QCWeekly tracking, in-line and final inspection with photos against the approved sample.
DeliveryOne consolidated shipment, labelled by room, with site-ready documents.
White-label & trade pricing
White-label furniture manufacturing behind your studio's brand.
Behind your brand
NDA as standard. Documents, labels and site paperwork carry your studio's name if you want them to.
Transparent trade pricing
Factory price shown as is, plus a stated service fee. You decide what the client sees and where your margin sits.
Small briefs welcome
Send a single piece or a room list for review. Supplier minimum quantities, custom-development costs and service scope are confirmed in writing for that brief.
Consolidated delivery
US, UK, Australia, the Gulf and 14 more countries so far. One container, one packing list, duties estimated up front.
Item codes, proposed dimensions, materials, quantities and revision status in one editable workbook. A loose-furniture brief can be quoted on its own; cabinetry and renovation are separate scopes.
Illustrative example, not a customer project or supplier quotation. All three lines remain for review. Prices, freight, duty and service fees are blank pending a written quote.
Proposed living-room schedule · DEMO-LIVING-01
Item
Qty
Proposed overall size
Revision / approval
LR-01 · Sofa
1
2200 × 950 × 800 mm
R02 · For review
LR-02 · Lounge chair
2
800 × 850 × 760 mm
R01 · For review
LR-03 · Coffee table
1
1200 × 600 × 380 mm
R01 · For review
Example revision: The sofa width changes from 2400 mm in R01 to 2200 mm in R02. Confirm the revised price, lead time and sample before the named approver releases that exact revision for production.
For an Irish new build, start with a three-bedroom room list and mark the Eircode, site access, measurement owner and local installer before pricing the handover. Unknown costs stay blank. The workbook calculates a complete total only after each goods price and cost line has been entered. Supplier minimum quantities and any service, sample or handling minimums need written confirmation.
How do interior designers source furniture from China?
Send us the FF&E schedule or drawings. We match each line to vetted Foshan and Dongguan suppliers, return an options sheet with trade pricing, sample the materials, manage production and QC, and deliver one consolidated shipment to site.
Do interior designers get trade pricing?
Yes. You see the factory price as quoted plus our stated service fee, with no hidden markup. You decide the client-facing price and your margin.
Can you make furniture from my shop drawings and finish schedule?
Yes. CAD, PDFs or reference images are enough to start. We produce shop drawings where needed, sample finishes, and approve a first article with you before the run.
How long does custom furniture from China take?
Typically 4–10 weeks in production after drawing and sample approval, depending on category, plus 3–6 weeks of sea freight. Showroom stock ships in 1–3 weeks.
Is there a minimum order for custom or white-label pieces?
You can enquire about one piece or a small package. Feasibility depends on the supplier, material, finish and custom work. We confirm minimum quantities and any sample, development, handling or service fees before you commit.
Do you work white-label?
Yes. We stay behind your brand, sign NDAs as standard and can join client calls as your China team when useful.
Can you use customer's own material (COM) fabrics and leathers?
Yes. Ship COM to our Foshan warehouse or nominate a mill; we confirm yardage per piece before you order it and log every roll against the item code.
Can a project ship to more than one site, or in phases?
Yes. Hotels and multi-site projects are labelled by floor or site and shipped in phases to match the fit-out schedule.
Which FF&E files can a designer submit?
A dimensioned schedule (Excel or your own FF&E tracker), CAD or PDF drawings, and reference images are enough. We log each item against a shared project register so nothing is lost between revisions.
How should RFIs and submittals be tracked?
We keep one RFI log per project — question, owner, due date and response — rather than scattering it across email and WhatsApp. Shop drawings and samples go through the same register with a clear approval status.
Who prepares and approves shop drawings?
Our team prepares shop drawings for custom pieces from your spec; you or your named approver signs off the dated revision before production starts.
What belongs in the installation handover?
Current drawings, item and room codes, finish references, the packing map, hardware information and an issues log — so the site team has everything without chasing you for it.
Start with one line item
Send a spec. Get options, trade pricing and a sample plan back.
A designer-led project needs one controlled FF&E schedule, an RFI log and a submittal register — each item traceable from drawing to site. We name the file formats, document owner and approval authority before work starts.