Skip to content
SOURCE FOSHANFURNITURE SOURCING · 中国
EN
Send Your List

Sourcing service

Furniture Sourcing Agent in Foshan: Fees, Deposits, MOQs and What One Agent Covers

For sourcing services, Source Foshan’s 3–5% fee is agreed against a written scope and order-value basis. Fixed fees, consolidation-only work, minimum charges, deposits, inspection coverage and delivery dates are confirmed for the order.

Updated by the Source Foshan sourcing team in Foshan.

Crated furniture from several Foshan suppliers stacked in the Source Foshan consolidation warehouse before loading
Goods from nine suppliers staged for one container, Foshan

At a glance

  1. 01

    Our sourcing service fee is 3–5%, with the covered work and order-value calculation basis agreed in writing. Supplier prices and our fee are separate, and we take no supplier commissions. Fixed project fees, consolidation-only work and any minimum charge follow the quotation. Minimum order value: USD 10,000.

  2. 02

    Agree the deposit for each product line in the proforma invoice before paying. Record the balance-payment milestone, inspection scope, required report and authorised approver in the order terms.

  3. 03

    Accepted orders from several suppliers can be combined into one shipping plan. Confirm packed volume, weight, loading limits and destination delivery requirements before choosing the container.

  4. 04

    You can ask to source 1–5 pieces per design. The supplier confirms stock availability, custom-production acceptance and MOQ for each item. Consolidation combines accepted orders; it does not waive a supplier’s MOQ.

  5. 05

    Typical lead time from approved specification to container loading is 4–5 weeks for a whole-home order and 7–8 weeks for a hotel order; sailing, customs and final delivery are added per destination. Dates depend on the actual suppliers, approved scope and destination; confirm them in the written quotation and update them when the order changes.

01

Which sourcing guide should you use for your project?

Ask the team about this

Start with the decision you need to make. A whole-home owner needs a complete room list and delivery plan; a hotel buyer also needs repeatable specifications and phased handovers. Choosing an agent, approving a payment and clearing an import are separate decisions. Use the relevant guide below, then bring the outputs together in one current project brief.

From a room brief to a handover: Define the project; Compare matched offers; Control the order; Prepare delivery.
Project coordination map. Use the linked buying, payment, package and destination guides to build your brief. Open full diagram.
Buyer tasks and the working record to prepare
Your next decisionStart herePrepare this record
Understand the complete buying processFloor-plan-to-delivery guideStage-by-stage approval and responsibility schedule
Choose direct purchase, agent or resellerBuying-route comparison, including 1688 and Taobao agentsComparable specification, seller identity and service scope
Review a deposit or balance requestSupplier payment and exception checklistAccepted milestones, verified payment route and invoice reconciliation
Furnish one home or a hotelWhole-house and hotel package planningPriority/optional room list, budget basis and change log
Repeat a package across apartmentsMulti-apartment MOQ, lead time and batch releaseUnit mix, approved sample and complete-kit release list
Furnish a New Zealand propertyNew Zealand packages, imports and receiving planProduct/packing requirements, broker and delivery responsibilities
Plan an Australian hospitality orderAustralian warranty, restaurant and hotel refurbishment guideCommercial-use specification, local installation and remedy contacts

The guides contain planning tools and clearly labelled examples. They do not reserve production, establish a current freight quote or replace a supplier’s accepted terms. For a service proposal, send your item list, destination, budget currency and required usable date through the project brief form.

What should the agent hand over for each product category?

A useful shortlist makes the product comparable before it names a preferred supplier. Ask for the selected specification, alternative offered, unresolved questions and the person who will approve the choice. For every quoted line, identify the actual seller and manufacturer where known; one coordinator does not mean one factory makes the entire package.

  • Solid-wood or stone dining furniture: component materials, dimensions, top thickness, base construction, finish reference, weight, access and packing. Clarify solid timber versus veneer and natural stone versus a manufactured surface.
  • Outdoor loungers and daybeds: intended exposure, frame and weave material, cushion construction, cleaning instructions, replaceable components and the actual commercial warranty. Ask what model-specific testing supports a performance claim.
  • Hotel beds and mattresses: matching millimetre dimensions, support design, construction, intended use, applicable destination requirements and flat/roll-packed dimensions. Approve a representative sample before repeating the room type.
  • Lighting: exact model, voltage/frequency, driver, dimming compatibility, mounting and destination compliance responsibilities. A certificate for another model is not evidence for the fixture being ordered.
  • Curtains, rugs and upholstery: measured schedule, fabric/finish references, lining or backing, cleaning, permitted variation and any project-specific performance requirement. Record approved substitutions before production.

Review these records alongside the fee scope below. A supplier comparison, laboratory test, installation service and warranty claim are distinct deliverables; mark each as included, separately priced or outside the appointment.

02

What does a Foshan sourcing agent actually do that a factory does not?

Ask the team about this

A sourcing agent can coordinate several suppliers around one furniture list: compare quotations against a shared specification, confirm supplier acceptance and MOQ, arrange receiving and inspection, combine packing lists and coordinate shipment. Agree which tasks are included and which party is responsible for corrections, payment approval and delivery.

Visitors walking with a guide through furniture displays in Foshan.
Guided showroom comparison from the Singapore buyer’s visit. View the source case.
Visitors examining an open cabinetry display in a kitchen showroom.
Cabinetry-detail review from the Swiss buyers’ visit. View the source case.

The useful scope depends on your order. A single piece may need only collection and shipping coordination; a multi-room order may need supplier comparison, specification approvals and consolidation. The Milan client case describes six large pieces plus smaller items combined into a 6.8 m³ shipment.

03

How much do sourcing agents in China charge?

Ask the team about this

Three models exist, and the one you are offered tells you more than the number attached to it.

ModelHow it worksSuitsWhat to watch
Percentage of order valueA stated % of what you spend with suppliers, on top of the supplier’s own priceMost residential and FF&E projectsWhether it is charged on goods only or goods plus freight
Fixed project feeOne agreed number for the whole project, whatever the final spendDefined scopes: one house, one hotel floorFix what happens if the scope grows mid-project
Man-day ratePaid per day of sourcing, market visits or inspectionBuyers who mainly need eyes on the groundOpen-ended by nature — cap the days in writing

Compare the commercial structure as well as the fee. Ask who sells the goods, who receives each payment and whether supplier-linked commissions or resale margins exist. A reseller may quote one selling price; an agency offer should explain its fee basis and any agreed access to supplier quotations. A low fee alone does not establish either good value or a conflict of interest.

What Source Foshan charges: 3–5%

Our sourcing service fee is 3–5%, with the covered work and order-value calculation basis agreed in writing. Supplier prices and our fee are separate, and we take no supplier commissions. Fixed project fees, consolidation-only work and any minimum charge follow the quotation. Review the sourcing fee and scope alongside the supplier quotation. Mark samples, specialist testing, repeat inspections and repeat delivery as included or separately priced.

Deposits and balance payments: agree each milestone

Agree the deposit for each product line in the proforma invoice before paying. Record the balance-payment milestone, inspection scope, required report and authorised approver in the order terms.

What you are orderingConfirm before payment
Showroom stock in standard finishesStock reservation, condition, payment amount and collection date
Factory production runsDeposit, material purchase, production slot, cancellation terms and balance milestone
Cabinetry, wardrobes and other made-to-measure workApproved drawings, deposit, change costs, inspection and balance-release conditions

The proforma invoice and contract should identify the payee, payment amount, due date and approval condition. Confirm the current contracting entity and matching company bank account before paying. Photographs and inspection reports support the agreed approval process; they do not change the written payment terms.

Show supplier goods, sourcing services, inspection or testing, collection, storage, packing, international freight, import charges and destination delivery as separate quotation lines. Mark each service as included, separately priced or awaiting a quote so it is not charged twice. Use the landed-cost worksheet for the comparison.

What Source Foshan charges: 3–5% on an agreed order-value basis, confirmed in writing, with no supplier commissions, on orders from USD 10,000 of goods value. The supplier’s own quotation and our fee are always shown separately. Fixed project fees and consolidation-only work are quoted for their agreed scope.

Skip the guesswork

Send your list. Confirm the next step.

Share your quantities, destination and any drawings or reference images. We will review the brief and confirm the details needed for supplier quotations.

04

How do you compare furniture sourcing agents in China?

Ask the team about this

Seven checks separate a sourcing agent from a trading company with a website. Ask for all seven in writing before you pay anything.

CheckWhat a straight answer looks like
Fee modelA written fee basis, included work and separate charges. Ask who sells the goods, who receives each payment and how supplier-linked compensation is disclosed.
Supplier commissionsA written disclosure of any commissions or supplier-linked compensation, consistent with the quotation and agreement.
Legal entityA Chinese company name and unified social credit code you can look up, plus a corporate bank account in that exact name. Never a personal account.
Physical presenceVerifiable company details, a confirmed meeting location and a named contact. Ask who performs inspection and who reviews the report, including any subcontracted work.
Quotes per itemComparable supplier quotations against one specification, with the requested number and any unavailable alternatives stated.
QC evidenceAn agreed inspection plan identifying units or samples, checks, findings, untested features and release authority, plus the loading records included in the scope.
ConsolidationAn agreed receiving facility, storage terms, handling and packing charges, plus a packing list identifying measured and estimated dimensions.

Source Foshan’s sourcing fee is 3–5% for the written scope and order-value calculation basis, with fixed fees, consolidation-only work and any minimum charge confirmed in the quotation. We take no supplier commissions. Source Foshan is registered as 先培(佛山)家居有限公司, unified social credit code 91440604MAKLLJJ0X1, with its registered address in Chancheng District, Foshan. Meet the team and review the company details. Confirm the named coordinator, QC scope and any meeting location for your project.

Source Foshan QC team measuring a case good against the order specification before it is crated
Dimensions verified against the line item, before the balance payment
05

What does each category cost, and what is the real MOQ?

Ask the team about this

The category prices below are historical planning references from the quotations described here, not offers for your order. Confirm the current specification, supplier, price, MOQ and production date in a fresh quotation. The category links give the product context.

CategoryEx-works priceQuantity acceptanceProduction timingFull page
Solid-wood dining213 cm oak trestle table ≈ USD 750; upholstered side chair ≈ USD 135Confirm stock or custom MOQ per itemConfirm in the supplier quotationDining tables
Upholstered sofasUSD 295–635 per sofa, performance fabricConfirm stock or custom MOQ per itemConfirm in the supplier quotationSofas & sectionals
Beds & bedroom193 cm upholstered shelter bed ≈ USD 805Confirm stock or custom MOQ per itemConfirm in the supplier quotationBeds
Outdoor & poolStackable aluminium lounger USD 95–160; rope or HDPE USD 160–280; teak USD 280–550Confirm stock or custom MOQ per itemConfirm in the supplier quotationOutdoor sourcing
Hotel FF&EUSD 1,500–3,000 per key (3★), 3,000–6,000 (4★), 5,000–9,000 (5★)Confirm stock or custom MOQ per itemConfirm in the supplier quotationHotel & resort FF&E
Cabinetry & built-insQuoted per projectConfirm stock or custom MOQ per itemConfirm in the supplier quotationKitchen cabinetry
Lighting (Guzhen)Certification adds cost and 2–4 weeksConfirm stock or custom MOQ per itemConfirm in the supplier quotationFurniture & interiors

Indoor residential figures are converted from factory quotations in CNY at 7.1 CNY/USD, September 2026. Outdoor and per-key figures are the same ones published on our category pages, so the numbers do not contradict each other from page to page.

06

Lighting, mattresses and soft furnishings: the three categories that trip buyers up

Ask the team about this

These three sit outside the furniture factories, and each has a rule that catches people out.

Lighting comes from Guzhen, not Foshan — about an hour away

Confirm where the selected lighting is made and collected, then include that supplier in the same receiving schedule as the furniture. A lighting trip or a separate collection needs its own appointment, transport allowance and ready date.

Two things to settle before you order, because both are expensive to fix later:

  • Voltage. 110 V for North America, 220–240 V for the UK, EU, Australia and most of the Middle East. Factories default to whatever their usual market is; state it on the purchase order, per item.
  • Compliance. Identify the rules for the exact model and importing market before ordering. EU CE requirements apply under the relevant product legislation. For Australia, confirm the EESS scope, supplier and RCM requirements with the importer. A generic certification logo or another model’s report is not enough; obtain the applicable evidence and quote any additional testing and time.

Hotel mattresses: the US standard decides the whole specification

Mattresses shipped to the United States must meet two federal flammability standards. 16 CFR 1632 covers cigarette (smouldering) ignition; 16 CFR 1633 covers open flame — a 30-minute test in which peak heat release must stay under 200 kW. Both are prototype standards: a qualified prototype is tested, and every mattress built afterwards must match it in materials, components, design and assembly, with records kept for as long as that prototype is in production plus three years. For imported sets the label must carry the foreign manufacturer’s name and full address including country, plus the importer’s address. Ask for the prototype test report before production, not after. Confirm the actual destination and intended-use requirements with the importer and competent adviser. A report to BS 7177 or EN 597 is not a blanket approval for every UK or EU hotel project.

For freight, ask whether the specific mattress can be compressed or must ship flat. Compare its actual packed dimensions, permitted compression period and recovery instructions; do not assume one packing method suits every model.

Curtains and rugs are measured work, not catalogue items

Curtains are priced per window once the finished drop, heading type, lining and track or motor are known — a quotation given before someone has the measured schedule is a guess. Rugs are priced per square metre, and hand-knotted versus machine-woven is a multiple, not a percentage. Both are made to measure, which puts them on the critical path: order them at the same time as the furniture, not after the walls are finished.

07

Can furniture, lighting, tiles and sanitaryware travel in one container?

Ask the team about this

Accepted orders from several suppliers can share a shipment, but loading depends on measured cartons, weight, door access, stacking and restraint. The equipment’s internal volume is not a guaranteed furniture loading capacity. Obtain comparable LCL and FCL quotations for the same origin and destination services; there is no universal 15 m³ cost crossover. Use the package and container planning example with the actual packed list.

08

How is the furniture crated, and does it need fumigation?

Ask the team about this

ISPM 15 concerns regulated wood packaging, including qualifying solid-wood pallets, crates and dunnage. Approved treatment and marking requirements depend on the material; processed-wood exceptions exist. The furniture itself may also have destination-specific biosecurity requirements. Confirm goods and packaging separately with the importer or broker.

Packing levelWhat it protects againstISPM 15Use it for
Closed crate — all six sides boardedRain, crushing, forklift impactNeeded if the frame is solid wood; not for all-plywoodStone, glass, finished case goods, anything irreplaceable
Open frame — battens onlyKnocks, not waterNeeded — the battens are solid woodBulky, robust items inside a dry container
PalletForklift handling onlyNeededBoxed goods already in their own cartons

Four details prevent most of the problems we see: fit hinges to crate lids so an inspector can open a crate instead of prying it apart; leave 2–3 cm of cushioning around the item; add skids with forklift entry above about 100 kg and steel strapping above about 500 kg; and put desiccant in the crate, because a container crossing the tropics condenses inside. Building a crate from an approved drawing takes roughly 3–7 days, which is why crating is scheduled before production finishes, not after.

Ask the forwarder and destination broker to confirm which treatment, marks and documents apply to the actual packaging and shipment. Check any timing or validity requirements before booking; do not assume one certificate rule applies to every destination or treatment.

Crating and labelling furniture in the Foshan warehouse ahead of container loading
Crating and labelling — one packing list, measured CBM per line
09

How does a project run, from brief to delivery?

Ask the team about this
  1. Brief and compared quotes. Send a furniture list, FF&E schedule or floor plan. Agree specifications and compare the available supplier quotations.
  2. Samples or a model room. Agree which physical samples, drawings or mock-up room need approval and the time and cost for any revisions.
  3. Order and deposit. Confirm the product-line deposit, payee, change terms and balance milestone in the written order.
  4. Production. Track the supplier-confirmed dates and agreed updates; record approved substitutions and schedule changes.
  5. Inspection and consolidation. Check the agreed units or samples, record findings and corrections, and obtain the required payment and shipment approvals.
  6. Loading and delivery. Confirm the loading plan, sailing, customs responsibilities and destination appointment with the relevant providers.
10

What we do not do

Ask the team about this
  • We are not the cheapest quote in your inbox. We compare suppliers and show you the comparison; we do not chase a price by silently downgrading foam density or frame timber.
  • We do not take supplier commissions, which is also why we will not “get you the factory price and charge nothing”.
  • We do not sell our own brand. There is no house catalogue we are trying to push into your container.
  • We do not handle destination customs clearance in your country. We prepare the documents; a local broker clears them.
  • We do not take orders below USD 10,000 of goods value. Under that, the 3–5% fee does not cover the sourcing work; use the Foshan market guide or book a guided buying day instead.
11

How do I contact a sourcing agent in Foshan?

Ask the team about this

Contact the Source Foshan team through WhatsApp or email. Send your destination, item list and target delivery month; we will review the brief, identify missing details and confirm quotation timing.

  • WhatsApp: +86 151 9256 9580
  • WeChat: 15192569580
  • Email: [email protected]
  • Registered address: Room 101, Building 1, No. 17 Sanyou South Road, Shiwan Town Subdistrict, Chancheng District, Foshan, Guangdong, China. Confirm the actual meeting location and appointment before travelling.
  • Company: 先培(佛山)家居有限公司, unified social credit code 91440604MAKLLJJ0X1

A useful first message: destination country, what you are furnishing, roughly how many items or keys, and your target month on site. That is enough for a first answer without a call.

12

Proof, not adjectives

Ask the team about this

Source Foshan was founded by Forest Li, in furniture export since 2014; the team has delivered about 200 projects to 20+ countries and 40+ destinations. Three records with dates and photographs:

Whole-home residence, Greater Bay Area. 54 items from nine suppliers, received and checked in one warehouse, loaded into a single container. Read the project record.

Orange County, California. One 40HQ container unloaded at 09:41 and fully installed by 21:48 the same day. Read the delivery notes.

Singapore, after sales. An edge repaired and colour-matched on site, signed off at 14:15 — what happens when something arrives imperfect. Read the repair record.

Send your list and destination

Share quantities, rooms or a rough list. We will review your brief, identify any missing details and confirm the next steps and quotation timing.

Fields marked are required.

    Replies come from the sourcing team in Foshan. Supplier pricing, packed volume and freight depend on the confirmed specification and shipment details.

    FAQ

    Frequently asked questions

    How much does a furniture sourcing agent in China cost?

    Our sourcing service fee is 3–5%, with the covered work and order-value calculation basis agreed in writing. Supplier prices and our fee are separate, and we take no supplier commissions. Fixed project fees, consolidation-only work and any minimum charge follow the quotation. Minimum order value: USD 10,000 of goods. Agree the deposit for each product line in the proforma invoice before paying. Record the balance-payment milestone, inspection scope, required report and authorised approver in the order terms.

    Do you charge a commission or mark up the factory price?

    Our sourcing service fee is 3–5%, with the covered work and order-value calculation basis agreed in writing. Supplier prices and our fee are separate, and we take no supplier commissions. Fixed project fees, consolidation-only work and any minimum charge follow the quotation. Confirm the current contracting entity and company payment account before paying.

    What is the minimum order with Source Foshan?

    USD 10,000 of goods value. Below that, the 3–5% sourcing fee does not cover the work involved. For a shorter list, use the Foshan market guide or book a guided buying day; the day rates are published.

    How many projects has Source Foshan delivered, and since when?

    About 200 projects to 20+ countries and 40+ destinations. The team, led by founder Forest Li, has worked in Foshan furniture export since 2014; the company Xianpei (Foshan) Home Furnishing Co., Ltd. was registered on 7 September 2026. Dated delivery records are on the Projects page and in the case notes.

    What is the minimum order to fill a container from Foshan?

    There is no fixed minimum volume at which a full container is always cheaper. Compare complete LCL and FCL offers for the actual cartons, weight, route and delivery scope. Container counts for homes or apartments require the packed item list, loading constraints and the agreed equipment.

    Can I order just a few pieces, or do factory MOQs apply?

    You can ask to source 1–5 pieces per design. The supplier confirms stock availability, custom-production acceptance and MOQ for each item. Consolidation combines accepted orders; it does not waive a supplier’s MOQ. See the small-order conditions before placing orders.

    Can tiles, doors, sanitaryware and furniture go in the same container?

    Accepted orders from several suppliers can share a shipment when the goods, packing and destination requirements are compatible. Confirm measured packed dimensions, gross weight, handling needs, container and route limits with the forwarder before choosing a loading plan. Compare LCL, FCL and staged shipments on the same delivery scope.

    How long does it take from order confirmation to delivery?

    Typical lead time from approved specification to container loading is 4–5 weeks for a whole-home order and 7–8 weeks for a hotel order; sailing, customs and final delivery are added per destination. Agree a project schedule covering quotation, sample or drawing approval, production, inspection, packing, sailing, customs and final delivery. Dates depend on the actual suppliers, approved scope and destination; confirm them in the written quotation and update them when the order changes.

    Do you inspect the goods before they ship?

    Inspection is arranged under the agreed scope. Confirm the units or samples to be checked, the checks and reporting required, who closes defects, and who authorises balance payment and shipment. The report should record the quantity checked, findings and any untested features. The illustrative furniture inspection report shows one reporting format; it is not a completed customer inspection.

    Does lighting from China come with the right voltage and certification?

    Only if you specify it, per item, on the purchase order. Lighting comes from Guzhen in Zhongshan — about 45,000 lighting enterprises and roughly 70% of China’s domestic lighting market, an hour from Foshan — and a factory will build to whatever voltage its usual market uses. State 110 V or 220–240 V, and name the certification: UL or ETL for North America, CE for the EU, SAA for Australia. Testing an uncertified fixture adds cost and typically 2–4 weeks.

    What standards must hotel mattresses meet for the United States?

    16 CFR 1632 for cigarette ignition and 16 CFR 1633 for open flame, in which peak heat release must stay below 200 kW across a 30-minute test. Both are prototype standards, so ask for the prototype test report before production starts. Imported labels must carry the foreign manufacturer’s name and full address including country, plus the importer’s address. For the UK and EU the equivalents are BS 7177 and EN 597.

    Can you work from an interior designer’s FF&E schedule or spec book?

    Yes. Send your schedule as Excel or PDF with drawings or reference images. Agree the requested quotation fields and alternatives before supplier comparisons begin. Mark early packing-volume estimates separately from confirmed packed measurements, then update the shipping quote when those measurements and the destination scope are available. See working with designers and our BOQ templates.

    14

    Planning a church or community-space purchase?

    Ask the team about this

    For a US church project, separate repeatable furniture from technical finishes and compare the complete cost to the installation site. Use the church renovation sourcing guide to screen categories, delivery responsibilities and the programme, then the church chair specification and sample guide to prepare a seating enquiry.

    Sources and further reading

    Put the guide to work

    Send your list. We will tell you honestly how it would run.

    A floor plan, item list or reference images are enough to start the conversation. Our team will confirm missing details, service scope and quotation timing. Supplier prices, packed volume and freight are confirmed as the specifications and shipment details become available.

    Start Your Project

    WhatsApp +86 151 9256 9580 · [email protected] · WeChat 15192569580