Custom furniture · made to your drawing in Foshan, China
Custom Furniture Manufacturing in China, Managed Locally
Quick answer: Custom furniture sourcing turns a reference image, sketch or design file into an approved specification, shop drawing, material sample and inspection checklist before production. The safest workflow records every revision, names the approval owner, checks the first article where appropriate, and closes documented defects before packing and shipment.
Source Foshan develops custom furniture in Foshan, China, from a reference photo, sketch or CAD file: the piece is turned into a dimensioned shop drawing, matched to a specialist factory (upholstery in Longjiang, casegoods in Dongguan, stone in Shunde), approved with you as material samples and a first article, and consolidated with the rest of your order. Complete the agreed unit or sample checks and record findings, photographs and limitations before the release decision. Single-piece requests are reviewed against the design, materials and supplier capacity. Confirm the accepted quantity, sampling costs and production schedule in the quotation.
- Can I trust you?300+factories~200projects20+countriesQC and payment milestones in writing
- Do you get my problem?One-off piecesOdd sizesMatching setsHotel batchesDrawing revisions stay traceable
- Worth a conversation?ItemisedquotationOne-offrequests reviewedQuote from your drawing, before any deposit
Page reviewed · agree item-specific tolerances, dates and inspection coverage in the approved quotation and drawings.
Why people come to us for custom
Four situations, one process.
Tell us which one you are in and send what you already have. The drawing, sampling and inspection steps are the same; the factory, timing and price are not.
- You send
- Site measurements or a floor plan, plus the style you like.
- You get
- A piece drawn to the opening with stated tolerances (±2 mm on casegoods), checked against the drawing before it ships.
- You send
- The pieces you want in one finish, or a sample of an existing piece.
- You get
- One signed colour panel retained in two copies, matched under D65 light at every factory, and a side-by-side check before packing.
- You send
- The FF&E schedule or drawings, quantities and the opening date.
- You get
- A first article approved before the batch runs, in-production checks, and AQL sampling on 50+ identical units.
A real custom build, opened up
What a custom piece looks like before it is a piece.
These are unedited photos from Source Foshan production visits in Foshan and Dongguan factories. Each stage lists what is measured and what you receive, because an answer like “strict quality control” means nothing until you can see the foam.
Sheet 2507-Z158 · six views01Reference becomes a drawing
The sheet travels with the piece.
Your photo or sketch is redrawn as a dimensioned shop drawing: plan, elevation, section through the critical joint, materials by component, hardware by model, tolerances and a revision block. The factory checks it for buildability and it is what the inspector holds against the finished piece.
- Drawing in 1–2 weeks from brief
- Dimensions in mm, inches in brackets
- Drawings are yours
Signed drawing PDF with revision letter; the printed sheet stays on the piece through production.
Spec card on the frame02Frame or carcass
Structure is signed off bare.
Steel frames are checked for weld quality, squareness and powder-coat coverage; timber frames for species, moisture, joint type and glue-and-screw pattern. Nothing is covered until the structure has been photographed with a tape measure.
- Timber moisture 8–12%
- Frame overall ±2 mm, legs level within 1 mm
- Diagonals measured, not just sides
Frame-stage photos with measurements; moisture-meter reading where timber is solid.

Down ratio, ticking, zip03Foam and fill
The cushion is opened, not squeezed.
Foam density and thickness are checked against the approved sample by grade, and a cushion is unzipped to see the fill: feather-and-down ratio, inner ticking, whether the foam core is wrapped. Sitting on a cushion tells you how it feels today; the label tells you how it will feel in three years.
- Seat foam typically 35–40 kg/m³, back 25–30
- Feather/down blend stated by ratio
- Webbing or spring type per drawing
Photos of cut foam with labels, a cushion cross-section and the cover before final closing.
Piping, seam, pattern direction04Upholstery and detail
Seams, piping and the things you asked for.
Stitch density, seam alignment, piping consistency and pattern direction are checked while the cover can still be reworked. Integrated details from the drawing, a power outlet in a headboard, a tray that drops into an ottoman, a leather-wrapped rail, are test-fitted here rather than discovered on site.
- Your fabric or ours (COM/COL welcome)
- Metreage confirmed with 10–15% pattern allowance
- Every moving part on video
Detail photos of seams and hardware; video of anything that opens, lifts or swivels.
Bent oak · walnut inlay
05Joinery and finish
Colour is judged under daylight, next to your sample.
Sanding grade, veneer matching, stain against the signed colour panel, lacquer build and sheen are checked under a D65 daylight booth, not a showroom lamp. Solid timber is allowed to move; joints are checked flush and tight before the finish goes on.
- Colour match under D65 · 6,500 K
- Panel flatness ≤2 mm across the diagonal
- One lacquer batch per set
Side-by-side photo with the retained colour panel; adhesion test photo on an offcut.
Seat height, depth, back angle06First article
One piece is finished and sat in before the batch runs.
At roughly one-third of the lead time the first complete unit is measured, sat on, opened and closed, and photographed front, back, side and underside. Proportions that read wrong on the drawing are corrected on one unit rather than on twenty. On a one-off, this is the piece itself, checked at frame stage and again before finishing.
- Seat height and depth ±5 mm
- Upholstered overall ±10 mm
- Batch released only after your OK
First-article photo set with a measurements table; corrections listed.
Tray fit, seam line, base07Final inspection and packing
Checks against the drawing and first article.
Agree the custom pieces, unit or sample coverage, dimensions, finish, function and packing checks in writing. Confirm the reporting date and time for corrections before shipment. Report approval, release authority and balance payments follow the supplier terms. Custom items join the rest of your order in the Foshan consolidation warehouse.
- Written inspection coverage
- Report date agreed per order
- Packed to the written standard
Report identifies inspected items or samples; see inspection coverage and limitations and the illustrative report format.
What we make
Five categories, each with its own specialist workshop.
Pieces are matched by material and construction, not by whichever factory answers first. Kitchens, wardrobes and architectural joinery run through the integrated interior systems process.










Documentation · 01
What must a shop drawing contain?
A shop drawing is the document the factory builds from and the document the piece is inspected against, so it has to carry every dimension and material decision, not just the silhouette. A reference photo tells the workshop what the piece looks like; the drawing tells it what to cut. Source Foshan turns your photo, sketch or CAD file into a dimensioned drawing, the factory checks it for buildability, and you approve it before the deposit.
On every Source Foshan drawing
- Overall dimensions in millimetres: width, depth and height, plus seat height and seat depth for seating, and clear internal dimensions for storage.
- Orthographic views (front, side, top) and at least one section through the critical joint, with a scale bar and a stated drawing scale.
- Component dimensions, materials by component and finish specification: leg section, top thickness, apron height, arm width, cushion thickness, drawer box sizes; species and grade of timber, veneer or solid, board type and thickness, stone type and slab thickness, metal section and gauge; stain or lacquer reference, sheen level, edge profile, stone edge and surface finish, metal plating or powder-coat code.
- Revision block: drawing number, revision letter, date, and the name of the person who approved it.
- Upholstery build: foam density and grade per cushion, suspension type, fabric or leather reference with direction of pattern, stitching and piping detail.
- Hardware: hinge, slide, lock and lighting references with brand and model, and the opening direction of every door and drawer.
- Tolerances for overall size, gaps and alignment (table below), and any surface that must be flat to a stated limit; assembly and delivery notes: knock-down or assembled, which parts ship separately, fixing points for wall units, and access constraints at the destination.
Each item exists for a reason. Missing seat height is the most common cause of a chair that feels wrong; a missing section through the joint lets the factory substitute dowels for a mortise and tenon; an unstated sheen level is why two pieces in one room can look like different finishes. Fitted work also needs site measurements on the drawing, which is why kitchens and wardrobes run through the integrated interior systems process.
Documentation · 02
How do samples and first-article approval work?
You approve three things in sequence: material samples, then a dimensioned drawing, then the first finished unit. Material samples are physical, couriered to you where the decision needs your hands on it: fabric and leather swatches, timber finish panels, stone offcuts from the actual slab or batch, metal finish chips. The drawing is approved on paper. The first article is the first complete unit off the line, photographed and measured before the batch is finished.
Fabric and leather swatches, timber finish panels, stone offcuts from the actual slab or batch, metal finish chips. Confirm the sample, mock-up, custom-material and courier charges before commissioning them.
Confirm the courier dispatch and arrival estimateApproved on paper, with a revision letter and your name in the block. From this point the drawing, not the reference photo, is the contract with the factory.
Agree review dates and revision roundsReview the first unit before releasing the remaining batch. For a one-off piece, agree the frame or unfinished-stage checks before construction passes a point where changes become difficult.
Batch released only after your approvalFirst-article approval records the agreed checks on that unit against the drawing and samples. It does not replace the finished-batch inspection. Agree the inspection coverage, material checks and release decision for the production order, and record any accepted deviations.
Sample, mock-up and courier costs are confirmed before commissioning. Any credit against a later production order must state the amount and conditions in the quotation. Studios can read how sampling fits a white-label workflow on the designers page.
Documentation · 03
How are materials and finishes confirmed?
The manufacturing reference for visual colour comparison is ISO 3668, which specifies a D65 daylight illuminant, diffuse light at roughly 1,000–4,000 lux and neutral grey surroundings, and finishing plants and fabric mills around Foshan's furniture clusters use D65 light booths for this reason. A warm showroom lamp hides a cool-grey cast that a client will see at home.
Stain, lacquer, fabric and stone all vary between lots, so the approved sample is retained in two copies, one with you and one with the Source Foshan QC team, both labelled with project, item code and date. Fabric is ordered in one dye lot per item; stone is selected slab by slab with photos of the actual slabs before cutting; lacquer for a set is mixed in one batch.
Material choice affects compliance as well as appearance. Composite boards, foams and upholstery fabrics have their own rules in the US, UK and EU, and those rules apply while the piece is being made rather than afterwards. The guide to buying furniture from China summarises the documents to ask for; for contract-grade fabrics and foams on hotel work, see contract furniture sourcing.
Documentation · 04
Which tolerances should be agreed before production?
Agree the required tolerances on each drawing before production, including how and when they will be measured. The table gives reference values and example targets to discuss; the supplier must confirm the applicable standard, product scope and achievable tolerance for the actual item. Record measured results against that approved specification.
| Product or feature | Example target to confirm | Reference |
|---|---|---|
| Casegoods, overall width, depth, height | ±2 mm | Working standard; GB/T 3324-2024 baseline is ±5 mm |
| Door and drawer-front edge alignment | ≤1.2 mm | ANSI/AWI 0641-2019 Custom grade (Premium 0.8 mm, Economy 1.6 mm) |
| Doors and drawers on the same flat plane | ≤1.6 mm | ANSI/AWI 0641-2019 Custom grade |
| Gap between doors, drawer fronts and finished ends (flush overlay) | 3 mm nominal, uniform to ±1 mm | Working standard; AWI allows up to 3.2 mm with ±1.6 mm variance at Custom grade |
| Panel flatness (tops, doors, front panels) | ≤2 mm across the diagonal up to 1,400 mm | GB/T 3324-2024 |
| Sofa and upholstered seating, overall dimensions | ±10 mm | Working standard; foam and fabric make ±5 mm impractical |
| Seat height and seat depth | ±5 mm | Working standard |
| Stone tops, length and width up to 2 m | ±1.5 mm (1/16 in) | Natural Stone Institute, Dimension Stone Design Manual 2022 |
| Stone tops, thickness (15–30 mm slabs) | ±3 mm (1/8 in) | Natural Stone Institute, Dimension Stone Design Manual 2022 |
| Stone top flatness | 3 mm in 3 m | Natural Stone Institute, Dimension Stone Design Manual 2022 |
| Dining and side table, overall dimensions | ±3 mm | Working standard |
| Metal frames and bases, overall | ±2 mm; legs level within 1 mm | Working standard |
| Drawer sag (fully extended, loaded) | ≤10 mm | Working standard; GB/T 3324-2024 baseline is ≤20 mm |
A wardrobe can be within ±2 mm on every dimension and still rack if the diagonals differ, so diagonals are measured too. Tolerances are stated in millimetres on the drawing, with inches in brackets for US buyers, and the inspection records the measured value rather than a pass or fail alone.
Solid timber tops measure differently in Foshan's humid summer and a heated living room in January; the drawing states the moisture content at dispatch (typically 8–12%) and allows for it in the construction, for example with slotted fixings on a solid top.
Documentation · 05
What are the production milestones, and what do you receive at each?
Use these seven stages to agree the production and approval schedule. The week labels are an illustrative sequence, not a delivery commitment. The supplier-confirmed plan should name review dates, inspection coverage and the shipping cut-off, with time for corrections.
- 01Week 0
Drawing approved
CheckedBuildability, dimensions, materials, hardware, tolerances
You receiveSigned drawing PDF with revision letter
- 02Week 1
Materials in
CheckedTimber grade and moisture, stone slabs, fabric dye lot, hardware against the list
You receivePhotos of the actual materials; slab photos for stone
- 03Week 1–2
Components cut and machined
CheckedComponent dimensions, joinery cut, veneer matching
You receivePhoto update in the weekly consolidated report
- 04Week 2–3
Frame or carcass assembled
CheckedStructure, squareness, diagonals, dry fit, load
You receiveFrame-stage photos with measurements; in-production visit on complex pieces
- 05⅓ of lead time
First article
CheckedProportions, construction, comfort, finish direction against the drawing
You receivePhoto set for your approval; corrections listed
- 06Second half
Finishing and upholstery
CheckedColour and sheen against the retained sample, stitching, foam, hardware fitted
You receivePhotos under neutral light; wet-sample comparison for lacquer
- 07Last week
Final inspection and packing
CheckedAgreed inspection coverage against the drawing and sample; packing to the written specification
You receiveInspection findings and release decision; balance under the agreed payment schedule
Custom items can run alongside other orders, but the shipment depends on supplier readiness, approvals and any rework. Confirm a cut-off date and the cost of waiting or sending a late piece separately. Single-piece shipping is planned from packed size and the forwarder’s accepted service; see consolidation and shipping.
Approval control · installation handover
How do approvals become an installation-ready handover?
Recommended control: keep one approval and change register through production, then transfer the same item and revision codes into a room-by-room installation handover. This lets the installer identify what is current, what belongs together and where an exception must be recorded before work continues.
1. Keep each approval and change tied to a controlled revision
A useful register gives every decision a traceable item code and drawing or sample revision. If a change affects cost or schedule, record that effect before approval and withdraw the superseded version from the working set.
| Field | What to record | Control purpose |
|---|---|---|
| Item identity | Item code and the applicable drawing or sample revision. | Connects the decision to one defined item and version. |
| Decision | Approved, approved with a stated condition, rejected or returned for revision. | Prevents a comment from being mistaken for approval. |
| Authority and date | Approver name or role and the decision date. | Shows who released the next step and when. |
| Change effect | Confirmed cost and schedule effect, including “none” where applicable. | Makes the consequence visible before release. |
| Version withdrawal | Superseded revision and confirmation that it left the active working set. | Stops an obsolete drawing or sample being used later. |
2. Build the installation handover around room, item and package identity
The handover should let a site team match each room and item code to its components, packages, current drawing, hardware and fixings. It should also state the required clearance or interface note, the spare parts included and the route for reporting a missing or damaged item.
| Record group | Required identifiers and notes | Check |
|---|---|---|
| Location and item | Room code and item code. | Each item has one intended installation location. |
| Components and packages | Component IDs and package IDs. | Every required component is present and matched to its package. |
| Current instruction | Current drawing revision plus interface and clearance notes. | The site set matches the approved current version. |
| Hardware and spares | Hardware and fixing count, plus spare parts supplied. | Quantities reconcile before unpacking or installation. |
| Exception route | Named route for missing or damaged item reporting. | The team records the package, item and evidence before work proceeds. |
Confirm that the room code and item code match the intended installation location.
Reconcile component IDs, package IDs, hardware, fixings and listed spares.
Match the current drawing revision to the interface and clearance notes for that room.
Record a missing or damaged item against its room, item and package IDs before continuing.
Documentation · 06
How are defects documented and fixed?
A defect is recorded three ways before anyone decides what to do about it: a photograph with a scale reference, a measured value against the drawing tolerance and, for anything that moves or functions, a short video. The record names the item code, the location on the piece, the severity and the proposed action.
A cracked stone top, a frame that racks, glass without a tempering mark where specified.
Rejected outright; remade or creditedColour outside the signed standard, veneer mismatch on a visible face, a drawer that binds, a dimension outside tolerance.
Rework, or remake when structure or primary material is wrongA sanding mark on an underside, a thread end, a small glue spot inside a cabinet.
Fixed on the spot where possibleRework covers what can be corrected on the existing piece: refinishing a panel, re-upholstering a cushion, adjusting a door, replacing hardware. Remake applies when the structure or the primary material is wrong: a top cut 20 mm short, a frame out of square, timber of the wrong species. Agree who pays for the correction, the revised date and any payment or shipment hold. If a replacement workshop is proposed, confirm price, timing and rights to reuse the drawings before proceeding.
For example, an inspector finds a veneer panel visibly different from the approved sample on a sideboard. Record the item, photos, comparison conditions and severity. The buyer and supplier agree rework, acceptance or another remedy, then record the reinspection result and any effect on the shipping date. This is an illustrative workflow, not a completed client case. For how to read a factory's quality claims before placing custom work, see the guide to China furniture manufacturers.
Straight answers
What we do, and what we don't.
Saying no early saves you a month. If your project is on the right-hand list, we will say so on the first call and point you to a better route.
- One piece or a whole home, made to your reference, drawing or site measurements
- Upholstery, solid timber and veneer casegoods, stone and sintered-stone tops, metal frames, mixed materials
- Matching sets across several factories under one colour standard
- Hotel and restaurant batches with a first article and AQL sampling on 50+ identical units
- Customer's own fabric or leather (COM/COL), shipped to our Foshan warehouse
- Repeat orders from the drawing package we keep on file under your project code
- Exact copies carrying another brand's name, logo or protected design; we build to your specification, not to a brand
- Delivery in under four weeks for a made-to-order piece; showroom stock ships in 1–3 weeks instead, see sourcing from stock
- Structural or fire-rated building elements; interior doors and wall panels run through interior systems with the relevant certificates
- Prices without a drawing: a quotation is issued from the approved drawing, not from a photo
- Certification we cannot document: flammability, formaldehyde and timber-origin papers are collected from the factory before production, or the material changes

Case · whole-home residence, Greater Bay Area
54 items from nine suppliers, the custom pieces drawn first.
The custom sofa, dining table and wardrobes were drawn and sampled while showroom pieces were being selected, so the longest lead times started first. Everything met in the Foshan consolidation warehouse and left in one container; the balance to each factory was released after the client approved the inspection report.
- 54items in one order
- 9suppliers, one report
- 1container, balance after QC
Before you send a reference
Frequently asked questions
Anything else: send the photo anyway and ask. A quick look usually answers whether it is makeable and roughly at what cost.
Can you make just one piece?
Send the reference, dimensions, materials and quantity for a feasibility check. Some suppliers accept a one-off piece; material minimums, setup or sampling costs and supplier capacity determine the quotation. Confirm the accepted specification, inspection and complete delivery cost before ordering.
How much does custom furniture from Foshan cost compared with retail?
Compare the same dimensions, materials, finish, hardware and delivery scope. Source Foshan provides an itemised quotation from the agreed specification, including the sourcing fee and separately identified transport costs. There is no fixed saving for every design or order size.
How long does a custom piece take?
Use the supplier’s written schedule after drawing and sample approval. Materials, complexity, quantity and corrections affect production; inspection, packing, shipping and destination delivery need their own dates. A custom item can delay a combined shipment, so agree the cut-off and options for a late piece.
How do I know it will match the photo?
Approve the dimensioned drawing, material and finish samples and any first article before production. Agree the finished-piece checks, unit or sample coverage and tolerances against those approved revisions. Confirm the report date, time for corrections, release authority and supplier payment milestones in writing.
Can I supply my own fabric or leather for a custom sofa?
Send the fabric or leather reference before ordering or dispatching it. The supplier must confirm suitability, required quantity, allowance for pattern matching, cost and lead time from the approved drawing. Agree the receiving address and label the material with the project and item code so it can be checked before production.
Who pays if the first article is wrong?
Compare the result with the approved drawing, retained sample and agreed inspection criteria. Record whether the issue is a production deviation or a change to the approved specification. The order should state correction costs, reinspection, payment holds and schedule effects; approve any chargeable change before work continues.
Can you match a finish to a physical sample I already have?
Send the sample and confirm the required material and finish. Ask the supplier for a match panel and agree how it will be compared before approval. Timber species, grain and stone batches can change the appearance, so the accepted sample or exact product code must be recorded for production.
Can I reorder the same piece later, and who owns the drawings?
Request a repeat quotation using the approved drawing revision, materials and sample codes. The supplier must confirm current availability, quantity, price, lead time and any new finish sample. Record drawing ownership, permitted use and access to the files in the project agreement; do not assume a later order will use the same material batch.
Standards referenced on this pageGB/T 3324-2024 · ANSI/AWI 0641 · Natural Stone Institute · ISO 3668
- GB/T 3324-2024 木家具通用技术条件 (General technical requirements for wooden furniture), published 26 October 2024, in force 1 May 2025Table 1: overall dimension deviation ±5 mm; Table 2: adjacent-surface offset ≤2.0 mm, gaps ≤2.0 mm, warp ≤2.0 mm at 700–1,400 mm diagonal, drawer sag ≤20 mm
- SAMR National Public Service Platform for Standards — GB/T 3324-2017 record (withdrawn, replaced)Confirms the 2017 edition is withdrawn
- Architectural Woodwork Institute — ANSI/AWI 0641-2019 Architectural Wood Casework, section 3.4.11 TolerancesEdge alignment 0.8 / 1.2 / 1.6 mm and flat-plane alignment 0.8 / 1.6 / 3.2 mm for Premium / Custom / Economy; flush-overlay gap up to 3.2 mm with ±0.8 / 1.6 / 2.4 mm uniform variance
- Natural Stone Institute — Tolerances in the Dimension Stone Industry, Dimension Stone Design Manual (2022)Length up to 2 m ±1/16 in (±1.5 mm); thickness >15–30 mm ±1/8 in (±3 mm); countertop flatness 1/8 in in 10 ft (3 mm in 3 m); lippage 1/32 in (0.8 mm)
- JUST Normlicht — Colour matching according to ISO 3668:2001ISO 3668 visual colour comparison for manufacturing industries including furniture: D65 illuminant, 1,000–4,000 lux, neutral grey (Munsell N7) booth
Start with what you have
Send the photo, the sketch or the CAD file.
Source Foshan replies within one business day with whether it is makeable, which specialist factory it would go to, and what the drawing will cost to develop. Attach floor plans, reference images and material photos directly on the project form.