Step-by-step guide · written from Foshan · reviewed 30 September 2026

How to Buy Furniture From China: Costs, MOQ, Payment, QC and Shipping

Quick answer: Buying furniture from China usually becomes practical when the order is large enough for fixed export and freight costs to be shared across many items. Build the decision from the factory price, packing, consolidation, freight, duty, tax, delivery and installation; approve specifications, inspection coverage and payment milestones before ordering.

Start with a complete landed-cost comparison, not a universal order-value threshold. Product mix, packed volume, destination charges and delivery level determine whether importing makes sense. Agree the specification, payment milestones, inspection coverage and shipping responsibilities before placing orders; confirm prices and timing with the suppliers and forwarder for your shipment.

Finished furniture being inspected and photographed in the Source Foshan consolidation warehouse before loading
Step 7 of 10The pre-shipment inspection: a chance to document and resolve defects before dispatch, and the checkpoint for the agreed release and balance-payment decision.
Agree
payment and inspection milestonesWritten terms · verified company beneficiary
  • Is it worth it for me?Compare the same specification and delivery scope with a local quote
  • How long does it take?14–20 weeks end to end: 30–60 days production, 2–7 weeks at sea
  • What does it really cost?Goods + origin, freight, import and destination costs

Page reviewed by the Source Foshan sourcing team · planning ranges need current quotations; official references support the import checks below.

At a glance

Five checks before the first quotation.

  • 01Total costBuild the order from goods, origin work, freight, insurance, import and delivery. Leave unquoted charges visible; do not use a universal landed-cost multiplier.
  • 02Payment milestonesAgree the deposit, inspection and balance conditions for each supplier. A 30/70 split is one example; it is not a fixed term for every stock or custom order.
  • 0330–60 daysof production for most items; custom cabinetry and stone run 8–10 weeks. Ocean transit adds 14–18 days to the US West Coast, 28–45 to Europe or the US East Coast.
  • 04Packed sizePlan from carton dimensions, weight, stackability and a loading plan. A container’s nominal internal volume is not all usable space for mixed furniture.
  • 05DestinationCheck the product rules for the importing country before production. US timber declarations, composite-wood rules and flammability requirements have different scopes; UK rules require a separate check.

01 · Is it worth it for me?

Is buying furniture from China worth it for a home or small business?

The answer depends on the order and destination. Compare like-for-like materials, quantities and service levels, then add the costs the factory quotation excludes. Small shipments carry fixed charges across fewer items; larger shipments still need a loading plan and current import and delivery estimates. Use the scenarios below to identify which quotations you need.

Interactive · order size

My order is roughly…

Three things decide the outcome: how full the container is, how bulky-but-light the mix is, and the duty regime at your destination.

One sofa or one room

  • VerdictObtain a complete LCL quote, including origin handling, destination charges, customs and home delivery. Fixed charges can outweigh the product-price difference; compare with a local delivered alternative.
  • Landed multipleCalculate from itemised quotes
  • Ships asLCL when accepted by the forwarder; confirm the complete timetable
  • Where savings surviveA piece with a specification or design you cannot source locally; verify the complete cost
  • Better routeCompare a consolidated shipment only when the extra items are actually needed

Choose a supply route with the China furniture industry overview, then use the manufacturer verification guide to check who makes the goods. For minimum orders and mixed shipments, compare the China furniture wholesale options. Record your complete comparison in the landed-cost worksheet.

02 · The process

What are the steps from brief to delivery?

Ten stages, 14–20 weeks from a finished brief to furniture in the room. The order is fixed; the timings depend on how much is custom-made. Steps 7 and 8 are where your money is protected — never let a supplier ship first and inspect later. Tap a card for the detail.

  1. 01BriefEvery item with dimensions, materials, reference images, quantity and a target price, grouped by room or store.

    List every item with dimensions, materials, reference images, quantity and a target price. Group items by room or by store. A priced list with dimensions and reference photos is the brief every supplier needs before quoting.

  2. 02Shortlist suppliersTwo or three quotes per item; check the licence and ask who actually makes the piece.

    Compare two or three quotes per item from showrooms, factories or a local sourcing team. Check the business licence and ask who actually makes the piece; verifying a Chinese furniture manufacturer is a step of its own.

  3. 03Samples or showroom checkSit on it, open it, see the fabric card; approve a dimensioned drawing before any deposit.

    Sit on the sofa, open the drawers, see the fabric and finish cards. For custom pieces, approve a dimensioned shop drawing before any deposit.

  4. 04Quote & pro-forma invoiceSpecs, unit price, Incoterm, payment terms, lead time, packing standard and late-delivery penalty. Sign it.

    The PI states item specs, unit price, Incoterm, payment terms, lead time, packing standard and the penalty for late delivery. Sign it.

  5. 05DepositUsually 30%, by bank transfer to the supplier's company account.

    Usually 30% by bank transfer to the supplier's company account. The account name must match the business licence and the invoice.

  6. 06Production30–60 days for most items; weekly photo updates and a first-article check on anything custom.

    30–60 days for most items. Ask for weekly photo updates and a first-article check on anything custom. Upholstery takes 4–6 weeks of the timeline; late fabric delivery, not sewing, is the usual delay.

  7. 07Pre-shipment inspectionDimensions, finish, function and packing checks to the agreed unit or sample coverage.

    Record the inspected units or samples, findings and limitations before release. Agree responsibility for corrections and reinspection in the supplier terms.

  8. 08Balance & releaseReview the agreed inspection evidence before approving release and the balance payment.

    Record open issues, the release decision and the balance due under the agreed payment schedule before shipping.

  9. 09Export & ocean freightConsolidation, container loading, export declaration, sailing.

    Consolidation, container loading, export declaration, sailing. Ask for a freight rate valid at your shipping date, not at quotation.

  10. 10Import clearance & deliveryYour broker files the entry, duties are paid, the container is trucked to your door.

    Your customs broker files the entry, duties are paid, and the container is trucked to your address or warehouse. Appoint the broker before the vessel sails.

Steps 07–08 protect your money. The quality control and shipping page shows what a proper inspection covers, from material checks to packaging verification.

03 · What does it really cost?

What does furniture from China really cost once it lands?

Add the goods, origin work, freight, insurance, import charges and destination services for the actual order. The bands below are illustrative planning inputs, not live quotations or expected percentages for every shipment. Replace them with dated amounts in the landed-cost worksheet; keep unknowns open until confirmed.

Product cost, EXW or FOBFOB adds inland trucking and export handling100%
Export packing & cratingFoam, corner protection, ISPM-15 crates for stone and glass3–8%
Inland trucking to portFoshan to Nansha, Shenzhen or Huangpu, 1–3 hours1–3%
Ocean freightGet a dated route quote, including surcharges and rate validityper container / m³
Cargo insuranceInsure at 110% of CIF value0.3–0.6%
Destination port & handlingTerminal handling, documentation, broker feeUSD 600–1,500 / container
Duties & taxesDepends on national tariff code, origin, customs value and measures in force at entryBroker-confirmed
Last-mile delivery & unloadingDrayage, unpacking, debris removalUSD 500–2,000
Landed totalSum the confirmed amounts; identify estimates and unknownsOrder-specific
Duties are the swing factor

The six-digit HS code is only a starting point. National tariff lines, origin, customs value and entry-date measures determine the charges. Use the furniture HS code guide, USITC HTS and relevant destination tariff tool, then ask your broker for a dated line-by-line calculation before committing.

Freight rates move

Ocean freight is quoted per shipment and rises sharply in peak season (August–October) and before Chinese New Year. Ask for a rate valid at your expected shipping date, not at quotation; a worked 2026 example is in the wholesale guide.

04

What MOQs and payment terms should you expect?

You can ask us to source 1–5 pieces per design across several suppliers. Availability and minimum order quantity (MOQ) are confirmed per item: stock, a small custom order and a production run have different rules. Consolidation combines accepted orders into a shipment; it does not remove a supplier’s MOQ.

Showroom brands · Lecong, LongjiangOne piece from stock

Available stock may be sold as one piece. Confirm the exact model, finish, quantity, condition and dispatch date; a showroom display does not prove saleable stock.

Best for homeowners, designers, boutique hotels who want to sit on it first.
Small custom ordersConfirm each design

Ask whether the supplier can make 1–5 of the specified design. Dimensions, materials, fabric minimums, samples and setup work determine acceptance, price and timing; confirm each item in the quotation.

Best for a first room or a few specified pieces.
Volume productionSupplier-confirmed minimums

Production-line factories set minimums by model, material or finish batch. Combining different suppliers into one shipment does not waive any factory’s minimum.

Best for repeated designs for retailers, importers and projects.
Specialist workshops · stone, rattan, metalQuoted per project

For stone, metalwork, fitted pieces or a room package, agree drawings, measurement responsibility, setup and sample costs per job. A single custom piece needs an accepted specification and quotation.

Best for one-off custom pieces inside a larger order.
Ask for the full small-order cost

Our sourcing service fee is 3–5% on the agreed order-value basis. Confirm included services and any small-order minimum fee in writing. Separate goods, any sampling or setup, collection, storage, export packing, consolidation, freight and destination charges in the quotation; show inspection and coordination as included or separately priced. Ask which charges repeat if you ship a trial order first. An unquoted charge is still open, not zero.

Confirm the delivery postcode, packed dimensions, access and whether carry-in or assembly is included. Compare the result with a local delivered quotation before committing.

A smaller shipment in practice

Our Milan project combined six large pieces and smaller items into a 6.8 m³ shared-container shipment. The case records more than two months for sea transport and home delivery combined. It shows one completed shipment’s scale, rather than a minimum order or a standard transit promise.

Thinking of ordering one room before expanding? Compare a trial order with phased shipping.

Payment terms that protect youFive points to agree before payment.

  1. Agree the deposit and release conditions before orderingRecord the percentage, due event and approved inspection evidence for each payment. A 30/70 structure is an example to discuss, not an automatic term or a guarantee of recovery.
  2. Bank transfer to the registered company accountThe account name must match the business licence and the invoice. Never a personal account.
  3. Confirm bank details by phone or video before each paymentInvoice-swap fraud by email — a "new account" notice — is a payment-fraud risk; verify a change through a trusted contact.
  4. Write the failure clause into the PIAgree who pays for rework and reinspection, what holds payment or shipment, and who can accept a deviation. Record unresolved items before approving release.
  5. Compare payment protection with your bankSuitability depends on transaction size, counterparty risk and bank terms; a staged payment schedule does not guarantee recovery.

05

Which Incoterm and shipping option should you choose?

Choose a rule that matches the actual handover, then compare quotations using the same named place or port and Incoterms® version. Container cargo handed to a carrier before vessel loading may suit FCA; FOB and CIF are sea-transport rules. EXW, CIF and DDP allocate different tasks and risks, so confirm the importer, destination charges, unloading and delivery scope in writing.

FOB · Free on Board

FACTORYCN PORTAT SEAYOUR PORTDOOR SELLER'S RISK ENDS HERE
  • Seller pays up toGoods loaded on the vessel at the Chinese port, export-cleared.
  • You pay fromOcean freight, insurance and everything on the import side.
  • When to use itFor an agreed on-board handover at the named port. Discuss FCA if the goods are handed to a carrier at a warehouse or terminal first.
Furniture shipment stage illustrating the FOB · Free on Board hand-over point
Loaded at the Chinese port: from here the freight is yours to control.

Rule references: ICC Incoterms® 2020, EXW and DDP obligations, and CIF cost and risk transfer.

Container or LCL? Choose by volume, not weight

LCLbelow ≈ 12–15 m³

One sofa set up to a small apartment. Adds 5–10 days for consolidation; more handling, more damage risk; per-m³ cost 2–3× the FCL equivalent.

20 ft standard15–28 m³

A 1–2 bedroom apartment, or a 30–40 seat restaurant. Good for heavy stone and solid wood.

40 ft high-cubefrom ≈ 30 m³

Often a full 3–4 bedroom home, or 60–120 dining chairs plus tables and case goods. The standard choice for whole-home orders — 54 items from 9 suppliers fitted one on our Greater Bay Area residence.

06

How long does it take from order to delivery?

Plan 3–5 months in total: 30–60 days of production, one to two weeks for inspection and export, then two to seven weeks on the water. Add three to seven days at each end for customs and trucking, and two dead periods in the Chinese calendar.

Australia · Sydney, MelbourneDirect from Shenzhen; check quarantine rules for timber12–20 days
US West Coast · Los Angeles, Long Beach+5–10 days for LCL consolidation and deconsolidation14–18 days
Middle East · Dubai, Jebel AliDirect services; Gulf wood-packaging rules apply15–25 days
Northern Europe · Rotterdam, Hamburg, FelixstoweCape of Good Hope routings add 10–14 days when Red Sea services are diverted28–35 days
US East Coast · New York, SavannahMostly via the Panama Canal30–45 days
Two dead periods

Chinese New Year closes factories for two to four weeks (the 2027 holiday falls on 6 February) and the National Day holiday takes the first week of October. Orders confirmed in late December rarely ship before March.

Where the weeks go

Upholstery takes 4–6 weeks of the production timeline, and late fabric delivery — not sewing — is the usual delay. Custom cabinetry and stone push production to 8–10 weeks; start those lines first.

07

Which documents and compliance rules apply to furniture imports?

Every shipment needs a commercial invoice, a packing list and a bill of lading; most also need a certificate of origin, and anything on wooden pallets or in crates needs proof of ISPM-15 treatment. On top of those, the US and the UK have product rules that must be met while the goods are being made, not after they arrive. Compliance paperwork cannot be created after the fact: make it a condition of the PI.

Ask the supplier for TSCA, fire-test and timber-species documents at quotation. Your customs broker or local authority has the final word on what applies to your goods.

Export cartons labelled by room and item code with the packing list attached
One consolidated packing list, matching the invoice line by line, on every carton.
  • Commercial invoiceSeller, buyer, item descriptions with materials, HS codes, unit and total values, Incoterm and currency.
    Always
  • Packing listCarton count, dimensions, gross and net weights, contents by carton — matching the invoice line by line.
    Always
  • Bill of lading or sea waybillIssued by the carrier; confirm whether release uses an original bill, surrendered bill or sea waybill and what the carrier requires.
    Always
  • Certificate of originIssued by CCPIT or China Customs; required by many countries and needed for any preference claim.
    Most
  • ISPM-15 wood packagingPallets and crates heat-treated to 56°C at the core for 30 minutes (or fumigated) and stamped with the IPPC mark; untreated wood is refused or treated at your cost.
    Crates

08

What mistakes do first-time importers make most often?

The same seven errors account for most bad experiences, and none of them is about the furniture itself.

01Comparing apples with oranges

An EXW price from one supplier against a FOB or CIF price from another — then choosing the wrong one.

FixCompare the same rule, named place or port and delivery scope.
02Ordering from photos

Without checking foam density, frame timber or fabric weight — then a soft sofa or a light table arrives.

FixGrades and numbers on the PI; a sample or showroom visit.
03Skipping the inspection

To save a week — then finding damage after the balance has been paid.

FixAgree inspection-linked payment and release conditions before ordering.
04Paying a "new" bank account

From an emailed invoice change, without a phone check. A payment-fraud risk to resolve before sending funds.

FixPhone or video confirmation before every transfer.
05Under-estimating volume

Product dimensions do not include the finished export packaging or tell you how cartons can be stacked.

FixPlan the load from packed dimensions, not product sizes.
06Ignoring the import side

No broker, no bond, no Lacey or TSCA paperwork — and a container accruing storage at the port.

FixBroker appointed and documents agreed before sailing.
07Relying on trade fairs alone

Fairs are for discovery; orders are checked in showrooms and factories, which in Foshan are open all year.

FixPair the fair with a Foshan showroom day.
+Want the seven handled for you?

A local team that walks the showrooms weekly closes each of these by default.

Send your list →

09 · Service process

How Source Foshan helps you buy furniture from China

Source Foshan is a registered furniture sourcing agent based in Foshan and working in Dongguan (what a Foshan sourcing agent charges and covers). We help shortlist showrooms, factories and workshops against your brief, compare written quotations, confirm specifications and coordinate production, inspection and consolidation. The proposal should state the service fee, inspection coverage, report and approval milestones, packing requirements and destination responsibilities. Review the service commitments and project-specific scope before placing orders.

Furniture being collected from a supplier for consolidation
Step 9 · pickup from every supplierEach maker delivers on its own date to one warehouse; every arrival signed for and photographed.
Inspector holding the specification sheet beside the finished lounge chair
Step 7 · inspection against the sheetThe PI spec travels with the piece.
Wooden crate being labelled before export
ISPM-15 crates, labelled by roomSpecify protection and crating for the item and transport route.
Export packing of furniture with foam and corner protection
Packing to a written standardFoam, corners, moisture barrier — quoted per m³ up front.
Container being loaded at the Foshan consolidation warehouse
Step 9 · one planned containerHeavy crates low, sofas and mattresses filling the upper space, a load plan on paper first.
Furniture delivered into a client home overseas
Step 10 · to the roomRoom placement, unpacking and debris removal when included in the agreed scope.
Sectional sofa being checked module by module before packing
Step 7 · module by moduleBalance release follows the agreed inspection and payment milestones.

Guided buying visits run at USD 150 a day for an on-site guide and interpreter, USD 250 a day with a private car and driver, or USD 299 a day with a luxury 7-seat SUV. Describe your order at start your project, or read the service commitments first.

Field notes

What goes wrong when the steps are skipped — from people who paid for the lesson.

All articles

Decision worksheet · compare like with like

How should you compare a China furniture quotation with a local quotation?

Compare both quotations at the same destination and service level. Put goods, origin work, international transport, import, final-mile delivery and contingency in one sheet. For every line, mark included, excluded, quoted separately or unknown, then name the responsible party. A lower factory price is not comparable until these fields match.

Fill every row for the same destination, shipment mode and delivery level before deciding which quotation is lower.
Cost and responsibility groupRecord before comparisonStatus and owner
GoodsItem code, approved quantity, dimensions, material, finish, unit price and currency.Included / excluded / unknown · supplier or buyer
Origin workSamples, inspection, warehouse receiving, export packing, consolidation and transport to the named handover point.Included / quoted separately / unknown · supplier, sourcing team or forwarder
Freight and insuranceShipment mode, packed CBM, rate validity, surcharges, insured value, cargo clauses, deductible and claim contact.Included / quoted separately / unknown · forwarder or insurer
Import and destinationImporter of record, HS classification check, duty or tax, brokerage, port charges, storage, final-mile delivery, unloading and installation.Included / excluded / unknown · importer, broker or delivery team
Contingency and reviewExchange-rate assumption, quotation expiry, schedule buffer, inspection findings, rework, damage procedure and review date.Assumption plus trigger · named decision owner
Date every volatile input

Record the quotation date, validity, currency, destination, packed volume, shipment mode and the date a broker checked the tariff assumptions. Replace estimates when the route, timing or product classification changes.

If the quotation says DDP

Ask for the named destination, importer arrangement, duties and charges, delivery level, unloading, storage, installation, exceptions and claim route in writing. “DDP” on its own does not describe the complete handover.

How this comparison method is verifiedPrimary references for terms, cargo handling and insurance

Use the worksheet with the furniture sourcing scope, the inspection and release gates, and the shipping and consolidation process. Contract terms, broker advice and the issued insurance policy control a specific shipment.

From quotation to delivery

Keep one item list through the whole order.

A low quantity does not remove the need for clear specifications, packing and delivery terms. Use the same item codes in the quotation, approval, inspection report and packing list so you can compare what was ordered with what arrived.

01

Get a usable answer for each item.

If a field is still unconfirmed, keep it visible as an open question.

Small-order quotation checklist
RecordWhat the answer should identify
Stock or customThe exact model or approved drawing, size, material, finish and quantity; stock availability or supplier acceptance of the custom quantity.
Price and minimumsUnit price, currency, supplier MOQ, any sample or setup costs, sourcing and inspection fees, and whether a minimum service charge applies.
Approval and paymentSample or drawing revision, payment milestones, verified beneficiary, inspection coverage and who approves release.
Packing and collectionCarton count, packed dimensions and weight, reinforcement, supplier collection, storage and consolidation charges.
DeliveryNamed destination and shipping terms, freight, import and local charges, access requirements, and the scope of unloading, carry-in or assembly.
Timing and changesSupplier-confirmed readiness, quote validity, shipping plan, and the cost of delaying, changing or shipping one item separately.

Confirm which lines are included in a quoted package so they are not counted twice. Compare the same specifications and delivery level with your local option, then decide whether the saving or product choice justifies the order.

FAQ

Frequently asked questions about buying furniture from China

Can I buy just one sofa from China?

Yes, if the supplier accepts the order. Compare a written LCL quotation including packing, origin handling, destination charges, import and home delivery with a local delivered alternative. Fixed charges can outweigh a lower product price; there is no universal minimum spend that guarantees savings.

How much cheaper is furniture from China than buying locally?

There is no reliable percentage for every order. Match materials, dimensions, finish, quantity, warranty and delivery level, then compare the complete landed total. The landed-cost worksheet helps record current quotations, assumptions and unknown charges without treating them as zero.

How do I pay a Chinese furniture supplier safely?

Confirm the contracting entity and payment beneficiary, and verify changed bank instructions through a trusted contact. Agree deposit, inspection and balance-payment milestones in writing before ordering. A 30/70 split is one possible structure, not a guarantee; discuss payment protection and any letter of credit with your bank.

Do I need a customs broker to import furniture?

Check the destination requirements and your importer arrangement before ordering. A qualified broker can help confirm classification, valuation, product documents, entry charges and filing deadlines. Agree who acts as importer and representative, including under DDP, rather than assuming the buyer always performs each role.

What happens if furniture arrives damaged?

Photograph the condition and packaging, record exceptions on the receipt and notify the named claim contacts within the applicable deadlines. Compensation depends on the contract, cause and issued insurance policy, including exclusions, limits and deductible. Inspection and cargo insurance do not guarantee recovery for every loss.

Can I mix furniture from several suppliers in one container?

Yes, subject to receiving dates, packed dimensions, weight and cargo compatibility. Agree the warehouse checks, packing, labels, document responsibilities and loading plan before supplier deliveries. The quotation should state consolidation fees and any storage, rework or separate-shipment charges.

Is furniture from China good quality?

Quality depends on the product specification, manufacturing control and inspection evidence. Name materials, dimensions, finish, hardware and applicable product requirements; approve samples or a first article where needed, then agree inspection coverage and the release decision before ordering.

How long does it take to get furniture from China?

Build a schedule from quotation and sample approval through production, inspection, packing, transport, clearance and final delivery. Timing varies with custom work, supplier readiness, route and holidays. Use a supplier-confirmed production plan and dated forwarder itinerary, with time for corrections and access arrangements.

Can I buy 1–5 pieces per design from several suppliers?

You can request this, but each supplier must accept the quantity and specification. Available stock may be sold as one piece; custom work depends on materials, samples, setup and production minimums. Consolidation combines accepted orders into one shipment and does not remove a factory’s MOQ. Confirm quantities, service fees, packing and complete transport costs before ordering.

What extra costs matter on a small furniture order?

The sourcing service fee is 3–5% on the agreed order-value basis. Confirm included services and any small-order minimum fee in writing. Separately identify goods, sampling or setup, collection, storage, packing, consolidation, freight and destination charges; mark inspection and coordination as included or separately priced. Ask which charges repeat on a separate trial shipment and confirm carry-in or assembly scope. Leave unquoted charges open rather than treating them as zero.

Sources and further readingTransit times, packaging, US and UK product rules

Put the guide to work

Send your list. We will tell you honestly whether it is worth shipping — and what it would land at.

A floor plan, a product list, a quotation you already have or a rough brief is enough. Our local team in Foshan replies within one business day with real options, prices and lead times — no commitment.

Buyer comparing sofas in a Foshan showroom
Steps 1–3Brief, shortlist, sit on it
Design sheet laid on the finished sofa
Steps 4–6PI, deposit, production
Inspection in the consolidation warehouse
Steps 7–8Inspect, then pay
Container on its way to the port
Steps 9–10Ship, clear, deliver