A cabinet installation handover pack connects the approved drawing revision with every room, cabinet, panel, carton, hardware bag, appliance interface and open issue received on site. This Source Foshan template makes that chain visible in HTML. It remains a general tool unless current first-party records confirm it as the company’s operating process.
- 300+vetted suppliers
- ~200projects delivered
- 20+destination countries
- QCscope agreed in writing
Updated by the Source Foshan sourcing team in Foshan.
At a glance
- 01
The installer should be able to identify the current drawing, every cabinet and panel, the hardware required and the correct installation sequence.
- 02
Stable identifiers connect the drawing, label, carton, hardware bag and issue report.
- 03
Openings and service locations should be checked against current appliance and site information, not assumed from an early design file.
- 04
The handover pack should remain active until missing parts, adjustments and damage are resolved.
Direct answer
A cabinet installation handover pack connects the approved drawing revision with every room, cabinet, panel, carton, hardware bag, appliance interface and open issue received on site. This Source Foshan template makes that chain visible in HTML. Use it as a planning template and agree the actual handover documents and responsibilities for your project.

The installer should be able to identify the current drawing, every cabinet and panel, the hardware required and the correct installation sequence.

Document index
- Approved drawings — Plans, elevations, sections, details and current revision status.
- Room and item schedule — Room, elevation, cabinet, panel and carton identifiers.
- Site interfaces — Verified dimensions, power, plumbing, appliances, walls, floors, ceilings and finishes.
- Hardware schedule — Hinges, runners, handles, fixings and adjustment information by item.
- Packing and load records — Carton list, container position and delivery phase.
- Issue process — Missing, damaged or incorrect item form with owner and response route.
Stable identifiers connect the drawing, label, carton, hardware bag and issue report.

| Level | Example placeholder | Meaning |
|---|---|---|
| Room | K01 | Kitchen 01 |
| Elevation | K01-E02 | Second elevation in Kitchen 01 |
| Cabinet | K01-E02-C03 | Third cabinet on that elevation |
| Panel or part | K01-E02-C03-P07 | Seventh labelled component |
| Hardware pack | K01-E02-C03-HW | Hardware for that cabinet |
| Carton | CT-001, CT-002… | Shipping carton cross-referenced to contained parts |
The actual code can differ, but it should be unique, readable on site and used consistently across drawings, labels, packing lists and issue records.
Openings and service locations should be checked against current appliance and site information, not assumed from an early design file.

Pre-install checks
- Site condition — Walls, floors, ceilings and access are ready within the agreed tolerance.
- Appliances — Current model numbers and manufacturer installation dimensions are recorded.
- Services — Power, water, waste and ventilation locations are verified.
- Openings and fillers — Clearances, scribes, panels, end conditions and sealant responsibilities are assigned.
- Fixings — Substrate and approved fixing method are known.
- Spares — Extra fixings, hardware and finish repair materials are labelled and counted.
Send your list. Get compared options from Foshan within one business day.
Real suppliers, real prices and lead times side by side, from a local team that walks the showrooms and factories every week. No commitment.
The handover pack should remain active until missing parts, adjustments and damage are resolved.

Installation sequence
- ReceiveCount cartons, photograph visible damage and record exceptions before movement.
- SortGroup cartons by room and elevation without losing labels.
- VerifyCheck the current drawings, site dimensions, appliance data and first cabinet position.
- InstallFollow the agreed sequence and record concealed conditions or deviations.
- TestCheck alignment, operation, fixings, services and finish.
- CloseComplete the punch list, replacement record, adjustment notes and final sign-off.
What if a hardware bag is missing?
Use the cabinet code to report the exact missing item, check the spares register and avoid substituting unapproved hardware.
Who confirms appliance openings?
Name the responsible measurer and approver. Verify the current appliance model and site services before production and again before installation.
Should spare hardware be supplied?
Define the required spares by product and contract, then label and record them in the handover pack.
Decision aids and working diagrams




Use this handover template
Connect the current drawing revision with the items delivered to your site, and agree who supplies and signs each handover record.
Fill in your own room, item and carton codes, appliance interfaces and open issues. Confirm which records the supplier, installer and project coordinator will provide, and who accepts each handover.
Update the pack when drawings, site measurements, item codes or responsibilities change. Blank fields and examples are planning tools, not records of a completed installation.
Field notes · from the blog
What buying in Foshan is actually like, from people who paid for the lesson.
How to calculate furniture cubic metres from carton dimensions
Calculate each packed carton in cubic metres, multiply by the number of identical cartons, and add the line totals.
Buying a Wall Bed Sofa from China: Fit, Mechanisms and Installation
Specify a wall bed sofa and transforming table: room clearance, mattress limits, model instructions, anchoring review and shipment checks before ordering.
Sourcing Power Recliner Sofas from China: Dimensions, Mechanisms and QC
Turn a recliner reference image into an agreed specification: dimensions, movement, upholstery, electrical components, sampling and pre-shipment checks.
Send your list. We will tell you honestly how it would run.
A floor plan, an FF&E schedule, a product link or a rough brief is enough. Our local team in Foshan replies within one business day with real options, prices and lead times — no commitment.
Start Your ProjectWhatsApp +86 151 9256 9580 · [email protected] · WeChat 15192569580