Installation resource
Dossier de remise pour l’installation des meubles sur mesure
A cabinet installation handover pack connects the approved drawing revision with every room, cabinet, panel, carton, hardware bag, appliance interface and open issue received on site. This Source Foshan template makes that chain visible in HTML. It remains a general tool unless current first-party records confirm it as the company’s operating process.
- 300+fournisseurs agréés
- ~200projets livrés
- 20+pays de destination
- Contrôle qualitéétendue convenue par écrit
Mis à jour par l'équipe d'approvisionnement Source Foshan à Foshan.
En un coup d'œil
- 01
The installer should be able to identify the current drawing, every cabinet and panel, the hardware required and the correct installation sequence.
- 02
Stable identifiers connect the drawing, label, carton, hardware bag and issue report.
- 03
Openings and service locations should be checked against current appliance and site information, not assumed from an early design file.
- 04
The handover pack should remain active until missing parts, adjustments and damage are resolved.
Réponse directe
Un dossier de remise pour l'installation de meubles relie la révision de plan approuvée à chaque pièce, meuble, panneau, carton, sachet de quincaillerie, interface d'appareil électroménager et point en suspens reçus sur le chantier. Ce modèle Source Foshan rend cette chaîne visible en HTML. Utilisez-le comme modèle de planification et convenez des documents de remise et des responsabilités réels pour votre projet.

The installer should be able to identify the current drawing, every cabinet and panel, the hardware required and the correct installation sequence.

Document index
- Approved drawings — Plans, elevations, sections, details and current revision status.
- Room and item schedule — Room, elevation, cabinet, panel and carton identifiers.
- Site interfaces — Verified dimensions, power, plumbing, appliances, walls, floors, ceilings and finishes.
- Calendrier du matériel — Hinges, runners, handles, fixings and adjustment information by item.
- Packing and load records — Carton list, container position and delivery phase.
- Issue process — Missing, damaged or incorrect item form with owner and response route.
Stable identifiers connect the drawing, label, carton, hardware bag and issue report.

| Niveau | Example placeholder | Meaning |
|---|---|---|
| Chambre | K01 | Kitchen 01 |
| Elevation | K01-E02 | Second elevation in Kitchen 01 |
| Armoire | K01-E02-C03 | Third cabinet on that elevation |
| Panel or part | K01-E02-C03-P07 | Seventh labelled component |
| Hardware pack | K01-E02-C03-HW | Hardware for that cabinet |
| Carton | CT-001, CT-002… | Shipping carton cross-referenced to contained parts |
The actual code can differ, but it should be unique, readable on site and used consistently across drawings, labels, packing lists and issue records.
Openings and service locations should be checked against current appliance and site information, not assumed from an early design file.

Pre-install checks
- Site condition — Walls, floors, ceilings and access are ready within the agreed tolerance.
- Appareils électroménagers — Current model numbers and manufacturer installation dimensions are recorded.
- Services — Power, water, waste and ventilation locations are verified.
- Openings and fillers — Clearances, scribes, panels, end conditions and sealant responsibilities are assigned.
- Fixings — Substrate and approved fixing method are known.
- Spares — Extra fixings, hardware and finish repair materials are labelled and counted.
Envoyez votre liste. Recevez des options comparatives de Foshan sous 24 heures ouvrables.
Des fournisseurs, des prix et des délais de livraison réels, grâce à une équipe locale qui visite les showrooms et les usines chaque semaine. Sans engagement.
The handover pack should remain active until missing parts, adjustments and damage are resolved.

Installation sequence
- ReceiveCount cartons, photograph visible damage and record exceptions before movement.
- SortGroup cartons by room and elevation without losing labels.
- VérifierCheck the current drawings, site dimensions, appliance data and first cabinet position.
- InstallerFollow the agreed sequence and record concealed conditions or deviations.
- TestCheck alignment, operation, fixings, services and finish.
- FermerComplete the punch list, replacement record, adjustment notes and final sign-off.
What if a hardware bag is missing?
Use the cabinet code to report the exact missing item, check the spares register and avoid substituting unapproved hardware.
Who confirms appliance openings?
Name the responsible measurer and approver. Verify the current appliance model and site services before production and again before installation.
Should spare hardware be supplied?
Define the required spares by product and contract, then label and record them in the handover pack.
Outils d’aide à la décision et schémas de travail




Utiliser ce modèle de remise
Reliez la révision de plan en cours aux articles livrés sur votre chantier, et convenez de qui fournit et signe chaque document de remise.
Renseignez vos propres codes de pièce, d'article et de carton, les interfaces d'appareils et les points en suspens. Confirmez quels documents seront fournis par le fournisseur, l'installateur et le coordinateur de projet, et qui accepte chaque remise.
Mettez le dossier à jour lorsque les plans, les relevés sur site, les codes articles ou les responsabilités changent. Les champs vierges et les exemples sont des outils de planification, et non des preuves d'une installation achevée.
Notes de terrain · du blog
Ce que signifie réellement faire des achats à Foshan, vu par ceux qui ont payé pour ça.
How to calculate furniture cubic metres from carton dimensions
Calculate each packed carton in cubic metres, multiply by the number of identical cartons, and add the line totals.
Buying a Wall Bed Sofa from China: Fit, Mechanisms and Installation
Specify a wall bed sofa and transforming table: room clearance, mattress limits, model instructions, anchoring review and shipment checks before ordering.
Sourcing Power Recliner Sofas from China: Dimensions, Mechanisms and QC
Turn a recliner reference image into an agreed specification: dimensions, movement, upholstery, electrical components, sampling and pre-shipment checks.
Envoyez-nous votre liste. Nous vous dirons en toute franchise comment cela se déroulerait.
Un plan, un cahier des charges FF&E, un lien produit ou un brief sommaire suffisent. Notre équipe locale à Foshan répond sous un jour ouvré avec de vraies options, des prix et des délais — sans engagement.
Start Your ProjectWhatsApp +86 151 9256 9580 · [email protected] · WeChat 15192569580