Skip to content
SOURCE FOSHANFURNITURE SOURCING · 中国
EN
Send Your List

Pricing

Furniture & Building Materials Inspection Pricing

Every inspection is quoted on its scope. No packages, no booking fee, nothing charged until you approve the quote.

  • BasisPer inspection day, or per agreed scope
  • In writing firstScope and fee confirmed before any visit
  • No booking feeNothing charged until you approve

What moves the price

  • Factories & locations
  • Products & SKUs
  • Quantity & coverage
  • Inspection stage
  • Report depth
  • Timing

Included, and quoted separately

Included

  • On-site inspection on the agreed date
  • Measurements, photos, defect records
  • Written report with open items
  • Review by message or call
  • Travel within Foshan and Dongguan

Quoted separately

  • Travel outside Foshan and Dongguan
  • Re-inspection after rework
  • Laboratory testing, at the lab's price
  • A second factory on another day
  • Goods not ready on the day: per the quote terms

What a quote looks like

Pre-shipment · 1 factory, Longjiang · 120 pieces, 8 SKUs

Structure only
Inspection, 1 dayEvery piece accessible on the floorQuoted
Travel within FoshanIncluded
Report in EnglishMeasurements, photos, open itemsIncluded
Re-inspection, if neededOn request

Amounts appear on your written quote. Example scope, not a price list.

Already sourcing with Source Foshan?

In your contract

Agreed checks are included

The inspections written into your sourcing agreement are part of the service fee.

Add-ons

Extra scope is quoted

Another factory, a loading check or a re-inspection beyond the contract.

QC on sourcing projects

What we need to quote

  • Product type
  • Factory city
  • Quantity & SKUs
  • Stage
  • Ready date
  • Destination

Questions about fees

Is there a deposit to book?

No. You approve the written quote; invoicing follows the terms on it.

What if the goods aren't ready on the day?

We confirm readiness with the factory before travelling. If the visit still can't go ahead, the quote terms say how the day is handled.

Do you mark up lab tests?

Lab work is quoted separately at the lab's price, with our coordination stated on the quote.