Furniture Last-Mile Delivery Checklist
Furniture last-mile delivery should define the service level, vehicle position, unloading responsibility, route dimensions, lift and doorway constraints, protection, crew, equipment, item count, condition check and sign-off before the appointment. This Source Foshan checklist keeps those tasks explicit; carrier deadlines and liabilities still depend on the current quotation and governing terms.
- 300+fournisseurs agréés
- ~200projets livrés
- 20+pays de destination
- Contrôle qualitéétendue convenue par écrit
Mis à jour par l'équipe d'approvisionnement Source Foshan à Foshan.
En un coup d'œil
- 01
“Door delivery” can describe very different physical services. Name each movement and task.
- 02
Measure the route from vehicle position to final room, including the points where an item must turn.
- 03
The consignee, carrier, building manager and installer should work from the same appointment record.
- 04
The receipt should preserve what was actually observed without delaying urgent safety action.
Réponse directe
Furniture last-mile delivery should define the service level, vehicle position, unloading responsibility, route dimensions, lift and doorway constraints, protection, crew, equipment, item count, condition check and sign-off before the appointment. This Source Foshan checklist keeps those tasks explicit; carrier deadlines and liabilities still depend on the current quotation and governing terms.

“Door delivery” can describe very different physical services. Name each movement and task.

| Niveau | Typical boundary to confirm | Additional questions |
|---|---|---|
| Curbside | Vehicle-side drop at an accessible point | Who unloads and moves goods from the curb? |
| Threshold | First covered entrance | Are steps, gates or long carries included? |
| Inside delivery | Defined interior area | Which floor, room and protection are included? |
| Agencement des chambres | Named room for each item | Are unpacking and debris removal included? |
| Assembly or installation | Defined products and tasks | Who supplies tools, fixings and site approvals? |
Measure the route from vehicle position to final room, including the points where an item must turn.

Access survey
- Approach — Road width, height or weight restrictions and suitable vehicle route.
- Parking — Reservation, permit, loading window and distance to entrance.
- Vehicle and equipment — Tail lift, forklift, pallet jack, trolley, crane or manual team required.
- Entrance — Gate, doorway, threshold and weather exposure.
- Vertical movement — Lift dimensions, capacity, booking, stairs, landings and handrails.
- Interior route — Corridors, turns, floor protection and final-room dimensions.
- Temporary area — A safe place for counting, sorting and opening cartons.
Compare packaged dimensions with every critical opening. The assembled item dimension alone is not enough.
The consignee, carrier, building manager and installer should work from the same appointment record.

Delivery preparation
- Confirm cargoObtain item, carton, weight and packaged-dimension records.
- Confirm appointmentRecord date window, site contact, carrier contact and building rules.
- Confirm resourcesAssign unloading labour, equipment, floor protection and temporary storage.
- Brief the routeShare access photos, restrictions and escalation contacts.
- Prepare evidenceHave the packing list, camera, receipt instructions and issue form ready.
Envoyez votre liste. Recevez des options comparatives de Foshan sous 24 heures ouvrables.
Des fournisseurs, des prix et des délais de livraison réels, grâce à une équipe locale qui visite les showrooms et les usines chaque semaine. Sans engagement.
The receipt should preserve what was actually observed without delaying urgent safety action.

Receipt sequence
- Vehicle and seal — Record the vehicle or container and seal where relevant.
- Outer count — Reconcile cartons and item identifiers against the delivery list.
- Visible condition — Photograph tears, crushing, wetness, punctures and exposed product before movement.
- Receipt notation — Write specific observed exceptions rather than a generic “damaged” note.
- Opening check — Follow the applicable terms for immediate or concealed-damage inspection.
- Notice — Send the required records to the named parties within the verified deadline.
- Liquidation — Record room placement, missing items, damage and pending action.
Does curbside delivery include unloading?
Do not assume it. The quotation should state who removes each item from the vehicle and which equipment is provided.
What should be written on a damaged receipt?
Record the specific visible condition, affected carton or item identifiers, count difference and supporting photographs, subject to the carrier procedure.
Should packaging be discarded immediately?
Check the carrier, seller and insurance terms first. Packaging may be needed for inspection or a claim.
Utilisez cette checklist avec votre réservation de livraison
Confirmez la prestation réservée, les conditions d'accès et les contacts désignés avant l'arrivée du véhicule.
Convenez de qui décharge, quelle équipe et quel équipement sont inclus, où les marchandises seront déposées, et comment l'état et les articles manquants seront consignés. Vérifiez les délais de préavis, les frais et les responsabilités par rapport à la réservation et au contrat en vigueur avec le transporteur.
Mettez la checklist à jour chaque fois que le rendez-vous, l'itinéraire d'accès ou le niveau de service change. Conservez la confirmation de réservation, le bon de livraison et les éventuelles photographies avec la commande.
Références officielles et principales
- Règles ICC Incoterms 2020Présentation faisant autorité des règles Incoterms ; le contrat doit préciser la règle, le lieu et la version.
- UK GOV: Incoterms and customs valuationExplains DDP, DAP and DPU allocation and valuation context.
- Code CTU de l’UNECE (CEE-ONU)Recommandations internationales pour l’emballage et l’arrimage des engins de transport de marchandises.
Notes de terrain · du blog
Ce que signifie réellement faire des achats à Foshan, vu par ceux qui ont payé pour ça.
How to calculate furniture cubic metres from carton dimensions
Calculate each packed carton in cubic metres, multiply by the number of identical cartons, and add the line totals.
Buying a Wall Bed Sofa from China: Fit, Mechanisms and Installation
Specify a wall bed sofa and transforming table: room clearance, mattress limits, model instructions, anchoring review and shipment checks before ordering.
Sourcing Power Recliner Sofas from China: Dimensions, Mechanisms and QC
Turn a recliner reference image into an agreed specification: dimensions, movement, upholstery, electrical components, sampling and pre-shipment checks.
Envoyez-nous votre liste. Nous vous dirons en toute franchise comment cela se déroulerait.
Un plan, un cahier des charges FF&E, un lien produit ou un brief sommaire suffisent. Notre équipe locale à Foshan répond sous un jour ouvré avec de vraies options, des prix et des délais — sans engagement.
Start Your ProjectWhatsApp +86 151 9256 9580 · [email protected] · WeChat 15192569580