Ir al contenido
SOURCE FOSHANABASTECIMIENTO DE MUEBLES · China
ES
Envía tu lista

Stage · Before the balance is paid

Pre-Shipment Inspection for Furniture & Building Materials

Finished goods checked against your spec on the factory floor, before the crates close and the balance is paid.

Your date is a preference. We confirm it after the scope is agreed.

Cajas de mobiliario embaladas para exportación etiquetadas por habitación y código de artículo antes de la consolidación
En el sitioCartons labelled by room and item code before consolidation.

CuándoGoods finished, packing not yet closed

NeedsFactory access and a ready date

You prepareSpec, drawings, quantities, packing rules

ResultadoReport, then your release decision

Plazos

When it's the right moment

Ready to inspect

  • All items finished, not just a sample
  • Goods accessible, not sealed in crates
  • Packing started, or materials on hand
  • Factory has confirmed the date and access

Not yet

  • Part of the order still in production
  • Items split across factories, not all ready
  • Already loaded or crates closed

What you prepare

Five things we check against

Send what you have; we tell you what is still missing.

  • SpecificationsApproved drawings with revision numbers
  • Quantities & SKUsPer item, per factory
  • Samples & referencesFinish samples, shade codes, approved photos
  • Packing requirementsCarton rules, labels, crate type
  • Known concernsWhat went wrong last time, or what worries you
  • Factory contactSo we can confirm access and the date

Coverage

What the day covers, and what it can't

Anything outside the agreed scope is written in the report as not checked.

Covered on the day

  • Every piece, or an agreed sample
  • Sizes, finish, function, packing
  • Items accessible on the floor
  • Carton count and labels

Needs arrangement

  • Items at a second factory
  • Goods not yet packed
  • Lab tests for ratings
  • Loading supervision on another day

Not checked

  • Concealed frames and internal boards
  • Items inside sealed crates
  • Chemical and durability properties

How it runs

Four steps, each with an input and an output

  1. STEP 1

    Request

    Order, factory, quantity, preferred date.

    Out: request number, reply from the team.

    Not yet booked.

  2. STEP 2

    Scope & fee

    Coverage, access limits and date confirmed with the factory.

    Out: written scope and quote to approve.

  3. STEP 3

    On the floor

    Measured, photographed, defects recorded by item.

    Out: findings with photo references.

  4. STEP 4

    Report & decision

    Reviewed with you, open items listed.

    You decide: release, hold, rework.

If something fails

Finding, decision, rework, re-check

Release and the balance payment stay your decision at every step.

Hallazgo

Recorded with measurement and photo. Item held.

Your decision

Accept, ask for rework, or book a re-inspection.

Rework

Supplier corrects; method and date recorded.

Re-inspection

Same reference re-measured. The first fail stays on file.

On the floor

What a pre-shipment visit looks like

P1 · Finished piece.
P2 · Label before closure.
P3 · Crates marked.

Previo al envío

Tell us when the goods will be ready

We confirm scope, fee and a date with the factory before anything is booked.